You are using an unsupported browser. Please update your browser to the latest version on or before July 31, 2020.
close
You are viewing the article in preview mode. It is not live at the moment.
Home > Service Bulletins > Dunkirk > Dunkirk Pilot Adhesive Change 11/10/23
Dunkirk Pilot Adhesive Change 11/10/23
print icon

Date: 11/10/2023

Product: 2021 DXL K-Series

From: Technical Support Department

Title: Pilot adhesive change

 

MODELS AFFECTED: DXL-060K thru DXL-235K

 

DATE RANGE: January 2021 to March 2023

 

NOTICE – Product Enhancement:

 

Infrequent field reports of nuisance failures associated with the DXL-K series boilers has prompted a change to the pilot assembly. The change eliminates any potential for electrical continuity created by the adhesive that holds the fiberglass sleeve in place. Electrical continuity in the area of the pilot ignitor can interfere with the flame rectification circuit and cause a nuisance shutdown.

 

To prevent any possible electrical continuity between the ignitor and ground, the adhesive used to hold the fiberglass sleeve in place has been moved from the ignitor to the other end of the sleeve. This was a rolling change implemented in March of 2023.

Feedback
0 out of 0 found this helpful

scroll to top icon